Behind Schedule! · 11:40pm Jan 13th, 2014
Holy crap, you guys! I am so, so sorry about the slow upload times on these chapters. This weekend was batshit crazy on the level of "Blues Brothers", and I'm only blowing that a little out of proportion. There was a back injury, and an incident with a bookshelf, and some neo-nazis got involved, and I almost got stabbed on a subway, and I just needed a bit to put myself together.
Good news, though! I've approached the final hurdle in training for my job, and soon I'll be all done with training! All of it! And now that I've finally gotten back into my routine, you can expect the same upload pace I had back in Lines, two or even three chapters a week if I can swing it! Next upload should be tomorrow evening, and we all get to watch the plot thicken.
Lastly, I've just recently finished catching up with MLP, burning through five episodes at once, and boy does that ever mess with your head. Since I did that last Thursday, I have not yet had a dream in which there wasn't at least one cameo by a member of the show. I think maybe I broke something. Pressing on!
Expect that upload tomorrow, and get ready for our little thief to get in way, way over her head.
Cheers!
Sounds just like a normal day in Australia.
All it needs is rabid kangaroos and it's perfect.
1715778
No roos, but I have acquired a stray cat as a pet. I can't have him in my room, so he mostly shows up and eats my hot dogs. I've called him Codger.
1715811
lol.
Codger confirmed for best hot dog thief.
1715827
I might write him in to the story. I need an animal in there anyway, might as well be a cat.
1715838
sounds like a plan.
And it's not like he'd be out of place, becaue cats are present in Equestria
Can't decide if this is more like a far-side cartoon or monty python skit.
Hope you recover from that... interesting weekend.
Good to hear that you're getting back on track! I'm looking forward to the update.
Ah, but did you have any musical numbers?
Somehow, I doubt that you ran into neo-nazis.
Worst of all, your profile pic is still Christmas themed!
1716090
An interesting weekend is a vast understatement if all that is to be believed. Thank God all I have to worry about is getting out of bed in the morning, taking a shower, and remembering to eat food.
Watch out for the bookshelves.